111filers, current period
59the period before
61controls it touches
17frameworks
The long view
Filings containing this phrase, every month since 2008. The last
point is the current month and is still filling, so it always looks lower than it will be.
2008
peak 59 in February 2024
2026
Share this finding
The card carries the whole thing, so it makes sense to somebody who never clicks through.
That is the point of it.
Who disclosed it
From SEC full-text search over 8-K filings. Every row links to the filing itself.
| Company | Form | Filed | |
| F5, INC. FFIV | 8-K | 2026-06-23 | filing |
| Coeptis Therapeutics Holdings, Inc. | 8-K | 2026-04-28 | filing |
| INTEGRA LIFESCIENCES HOLDINGS CORP IART | 8-K | 2026-05-05 | filing |
| Z Squared Inc. | 8-K | 2026-05-01 | filing |
| Nuburu, Inc. | 8-K | 2026-07-21 | filing |
| SOCKET MOBILE, INC. SCKT | 8-K | 2026-05-05 | filing |
| Cycurion, Inc. | 8-K | 2026-05-29 | filing |
| Red Cat Holdings, Inc. RCAT | 8-K | 2026-05-20 | filing |
| VIDA Global Inc. VIDA | 8-K | 2026-05-21 | filing |
| Quantum Computing Inc. QUBT | 8-K | 2026-06-23 | filing |
| FLEX LTD. FLEX | 8-K | 2026-05-05 | filing |
| Allegiant Travel CO ALGT | 8-K | 2026-05-13 | filing |
| Mobility Global Inc. | 8-K | 2026-07-02 | filing |
| Z Squared Inc. ZSQR | 8-K | 2026-05-21 | filing |
| Alcoa Corp AA | 8-K | 2026-07-01 | filing |
| Oil-Dri Corp of America ODC | 8-K | 2026-06-08 | filing |
The full search on EDGAR
Which industries file it
Companies grouped by the industry classification on their own filing. A count, not a
survey.
| Industry | | Companies |
|---|
| Software and IT services | | 32 |
| Securities and investment | | 12 |
| Chemicals and pharmaceuticals | | 7 |
| Banking | | 6 |
| Industrial machinery | | 5 |
| Pipelines and communications | | 4 |
| Services and entertainment | | 4 |
| Transport equipment | | 4 |
| Electronics and electrical equipment | | 3 |
| Holding and investment offices | | 3 |
What it obligates
Our corpus holds 61 controls across
17 frameworks whose text speaks to this. Not a judgement:
these controls say so, and each is one lookup from its source document. Ordered by how much each
framework has to say about it, so the one that will cost you the most work is first. Every name
opens that framework in the corpus.
What an auditor will ask you to produce
The artefacts named on those controls, most frequently cited first.
- BCP plan
- DR test results
- vendor dependency map
- critical service list
- BCM policy + BIA
- Business continuity / disaster response plans
- BC exercise results
- Backup and restore evidence
How it usually fails
Recorded when each control was verified against its source. This is where programmes
that think they are covered turn out not to be.
- untested DR
- single vendor dependency
- no exit plan
- missing comms tree
- Untested BC/DR plans
- Backups not verified
Where this comes from
The left half is public record: SEC full-text search over 8-K filings, counted across a
14 day window against the equivalent window before it. You can check
every row.
The right half is ours: 723 frameworks and
20,473 controls, 531 of those frameworks verified against
their source documents, with the auditor evidence and common failure modes recorded control by
control. Controls appear here because their own text names this term.
Today's edition ·
How programmes fail ·
The obligation index