57% of PTES you already have
ISO 13485 already covers about 57% of PTES, leaving
3 of 7 controls as genuinely new work.
Already covered 2
Likely covered 2
New work 3
What is genuinely new work
Nothing in ISO 13485 reaches these. This is the list to scope.
PTESPHASE-6Post Exploitation
PTESPHASE-7Reporting and Cleanup
Show the 4 you already have
PTESPHASE-2Intelligence Gathering (OSINT)
PTESPHASE-3Threat Modeling
PTESPHASE-1Pre-Engagement Interactions and Scoping
PTESPHASE-4Vulnerability Analysis
How this is calculated
Already covered means a mapping runs from a control in ISO 13485 to that control. Likely
covered means no direct mapping exists but both frameworks map to the same control in a third
standard. New work means neither. We keep those separate rather than adding them into one
friendlier number, because blending them would present a two-hop inference as a verified
fact.
Coverage is not symmetric.
Run it the other way and you will get a
different number; both are correct.
From 332,959 cross-framework control
mappings across 723 frameworks, 531 of them verified against
their source documents. It does not tell you that you are compliant: a mapped control means
the two standards ask for the same thing, not that you have done it.
Try another pair ยท
Today's edition