Framework overlap

Does APRA CPS 234 cover ISO 14064?

You hold APRA CPS 234 and have been told to do ISO 14064. Here is how much overlaps, control by control.

14% of ISO 14064 you already have

APRA CPS 234 already covers about 14% of ISO 14064, leaving 36 of 42 controls as genuinely new work.

Already covered 1 Likely covered 5 New work 36

What is genuinely new work

Nothing in APRA CPS 234 reaches these. This is the list to scope.

14064-1.10
Information Management and Data Quality
14064-1.4
Organisational Boundaries
14064-1.5
Reporting Boundaries and Categories
14064-1.6
Quantification of GHG Emissions and Removals
14064-1.7
Base Year and Recalculation
14064-1.8
Uncertainty Assessment
14064-1.9
GHG Inventory Reporting
14064-2.4
GHG Project Description
14064-2.5
Baseline Quantification
14064-2.6
Monitoring of GHG Project Emissions
14064-2.7
Project Reporting
14064-2.8
Permanence and Reversal Risk
14064-3.10
Competence and Independence of V/V Body
14064-3.11
Records and Confidentiality
14064-3.4
Validation and Verification Principles
14064-3.5
Level of Assurance and Materiality
14064-3.6
Validation/Verification Planning
14064-3.7
Site Visits and Evidence Gathering
14064-3.8
Evaluation Against Criteria
14064-3.9
Validation/Verification Statement
ISO-14064-1-10
Organization's role in verification activities
ISO-14064-1-4
Principles
ISO-14064-1-5.2
Reporting boundaries
ISO-14064-1-5.3
Quantification of GHG emissions and removals
ISO-14064-1-6
GHG inventory component assessment
ISO-14064-1-7
GHG inventory management
ISO-14064-1-9
GHG reporting
ISO-14064-2-5
GHG project requirements
ISO-14064-2-5.2
Identification of SSRs and GHG sources/sinks
ISO-14064-2-5.4
Baseline scenario selection
ISO-14064-2-5.6
Quantification of GHG emission reductions or removal enhancements
ISO-14064-2-6
Monitoring
ISO-14064-2-7
GHG project reporting
ISO-14064-3-10
Validation/verification statement
ISO-14064-3-6
Validation/verification planning
ISO-14064-3-7
Validation/verification approach
Show the 6 you already have
ISO-14064-1-5.1
Organizational boundaries
ISO-14064-1-5.4
Categorization of indirect GHG emissions
ISO-14064-1-8
Quality management of the GHG inventory
ISO-14064-3-5
Selecting the validator/verifier
ISO-14064-3-8
Assessing GHG data and information
ISO-14064-3-9
Evaluating GHG assertions

How this is calculated

Already covered means a mapping runs from a control in APRA CPS 234 to that control. Likely covered means no direct mapping exists but both frameworks map to the same control in a third standard. New work means neither. We keep those separate rather than adding them into one friendlier number, because blending them would present a two-hop inference as a verified fact.

Coverage is not symmetric. Run it the other way and you will get a different number; both are correct.

From 332,959 cross-framework control mappings across 723 frameworks, 531 of them verified against their source documents. It does not tell you that you are compliant: a mapped control means the two standards ask for the same thing, not that you have done it.

Try another pair ยท Today's edition